A38 A38 eastbound Liskeard layby closure
scheduled- Due to end
- 15 Oct 2026
- Started
- 5 Oct 2026
- What
- 1 lane closed, Tree and vegetation cutting
Lasting 7 days or more · 33 roads
National Highways lists 44 roadworks schemes lasting a week or more, 32 of them in force now. 23 are due to end before Christmas Day (25 Dec 2026).
A38 A38 eastbound Liskeard layby closure
scheduledM48 M48 eastbound Jct 2 to Jct 1 hard shoulder closure 199/9-194/6
scheduledM6 Lanes 2 and 3 closure southbound
in forceA5 Lane closure northbound including roundabout
in forceM1 M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
in forceA12 A12 northbound Jct 12 to 13 hard shoulder lane closure (MP 109/6 to 110/5)
in forceM62 M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
in forceM5 M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 258/7b - 257/0b
scheduledA66 A66 Little Burdon to Sadberge eastbound lane 1 closure
in forceM67 M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)
in forceA1(M) A1M SB L1 closed between MP 89/4 and 88/7
pausedA1033 A1033 eastbound Northern Gateway to Marfleet Lane 1 closure
in forceM42 M6 - M42 link road hardshoulder closure northbound
in forceA45 A45 lane closure eastbound
in forceM1 M1 northbound Jct 44 hardshoulder closure (305/2 - 306/1)
scheduledM56 M56 Eastbound Jct 6 to 4 hardshoulder closure
scheduledM6 M6 Southbound Jct 40 to 39 Lane 3 closure with Narrow lanes (Mp 459/4 - 455/7)
scheduledA45 lane closure
in forceM57 M57 Northbound hardshoulder closure (MP 17/1 to 17/4)
in forceM60 M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
in forceA35 A35 Kings Road Honiton 2 way traffic lights
pausedM27 M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
in forceA2 A2 eastbound hard shoulder closure (40/7A to 41/8A)
in forceA38 A38 eastbound Liskeard layby closure
scheduledM48 M48 eastbound Jct 2 to Jct 1 hard shoulder closure 199/9-194/6
scheduledM6 Lanes 2 and 3 closure southbound
in forceA5 Lane closure northbound including roundabout
in forceM1 M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
in forceA12 A12 northbound Jct 12 to 13 hard shoulder lane closure (MP 109/6 to 110/5)
in forceM62 M62 eastbound Jct 25 hardshoulder closure (94/6 - 95/3)
in forceM5 M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 258/7b - 257/0b
scheduledA66 A66 Little Burdon to Sadberge eastbound lane 1 closure
in forceM67 M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)
in forceA1(M) A1M SB L1 closed between MP 89/4 and 88/7
pausedA1033 A1033 eastbound Northern Gateway to Marfleet Lane 1 closure
in forceM42 M6 - M42 link road hardshoulder closure northbound
in forceA45 A45 lane closure eastbound
in forceM1 M1 northbound Jct 44 hardshoulder closure (305/2 - 306/1)
scheduledM56 M56 Eastbound Jct 6 to 4 hardshoulder closure
scheduledM6 M6 Southbound Jct 40 to 39 Lane 3 closure with Narrow lanes (Mp 459/4 - 455/7)
scheduledA45 lane closure
in forceM57 M57 Northbound hardshoulder closure (MP 17/1 to 17/4)
in forceM60 M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
in forceA35 A35 Kings Road Honiton 2 way traffic lights
pausedM27 M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
in forceA2 A2 eastbound hard shoulder closure (40/7A to 41/8A)
in forceM42 Lane 1 closure northbound (closing ERA)
in forceA45 A45 clockwise M42 Jct 6 (Bickenhill Interchange) partial roundabout closure (from the M42 northbound entry slip to the M42 southbound exit slip)
in forceM61 M61 Southbound hard shoulder closure (MP 34/2 to 33/8)
in forceA428 A428 eastbound Caxton Gibbet approach and roundabout - lane 1 closure
in forceM42 Hardshoulder closure northbound
in forceA40 contra flow westbound with eastbound closed from Horseshoe Drive
in forceM602 Hardshoulder closure Eastbound (MP 1/5 - 1/9)
in forceA500 A500 both directions Campbell Road over bridge carriageway closure
in forceA35 A35 Miles Cross Narrow Lanes for rdabt construction
in forceM23 M23 northbound Jct 10 24 hour lane 1 closure on exit slip road
scheduledA30 A30 both directions Five Lanes to Kennards House lane closures and 40 mph limit (24/7)
in forceA45 7.5t weight restriction
in forceA1 A1 southbound Water Newton narrow lanes with speed restrictions (MP 31/1 to 29/0)
scheduledM58 Mobile Hardshoulder closure East & Westbound from Switch Island - M6
in forceM25 M25 Anti-clockwise Jct 30 to Jct 29 Hard shoulder closure
pausedM62 M62 eastbound Jct 34 entry slip road closure 24/7
in forceA47 A47 Eastbound Church Lane static lane 2 closure
in forceA14 M11 southbound Jct 14 narrow lanes with speed restriction (MP 92/5 to 89/2)
pausedA57 M67 eastbound Back Moor to Gunn Inn - lane 1 closure for construction - bypass/new on behalf of National Highways
in forceM62 M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
in forceM5 M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
in forceDue to endis National Highways’ schedule, published in its roadworks feed, and dates can move. In force means crews have set it up; paused means National Highways has marked it suspended for now; scheduledmeans it is booked and may already be in place. Overnight closures shorter than a week are on each road’s own page.
National Highways currently lists 44 roadworks schemes lasting 7 days or more on 33 roads. Each is shown on this page with the date it is due to end, soonest first. The dates are National Highways’ own schedule and can move.
23 of the 44 long-running schemes are due to end before Christmas Day (25 Dec 2026). They are listed in their own section on this page. Shorter overnight closures are not included.