A66 Little Burdon to Sadberge eastbound lane 1 closure
1 lane29 Sept 2026 to 28 Oct 2026 · 1 lane closed, Roadworks
Roadworks and lane closures
2 closures in force on the A66 right now. National Highways has 7 closures booked in the next 24 hours, the first due from 6am, so it may already be in place.
Closure data updated 15:19 today
A66 Little Burdon to Sadberge eastbound lane 1 closure
1 lane29 Sept 2026 to 28 Oct 2026 · 1 lane closed, Roadworks
A66 Westbound Brougham to Kemplay Bank Lane 1 closure
1 lane5 Oct 2026 to 9 Oct 2026 · 1 lane closed, Construction work
A66 Westbound Brougham to Kemplay Bank Lane 1 closure
Due nowA66 Elton eastbound lane 2 closure
BookedA66 Yarm Road eastbound entry slip road closure
BookedA66 Boathouse eastbound exit slip road closure
BookedA66 Snow Gates Eastbound Lane 2 Closure
BookedA66 Eastbound Brough Entry slip road closure
BookedA66 Eastbound Jct 40 to Kemplay Rbt Lane 1 closure
BookedThese are closures National Highways has scheduled, mostly overnight. Plans can change on the night, and a closure only shows above as in force once our last check has seen it set up, so one that has passed its start time may already be in place.
A66 Little Burdon to Sadberge eastbound lane 1 closure
in forceEnd dates are National Highways’ own schedule and can move. Long-running roadworks on every road.
2 closures were in force at our last check of the National Highways feed (3:19pm today, UK time): A66 Little Burdon to Sadberge eastbound lane 1 closure; and A66 Westbound Brougham to Kemplay Bank Lane 1 closure. This covers planned roadworks and lane closures, not accidents.
National Highways has 7 closures booked on the A66 in the next 24 hours, the first due from 6am, so it may already be in place: A66 Westbound Brougham to Kemplay Bank Lane 1 closure; A66 Elton eastbound lane 2 closure; and A66 Yarm Road eastbound entry slip road closure, plus 4 more. Plans can change on the night.
One long-running scheme is listed: A66 Little Burdon to Sadberge eastbound lane 1 closure, due to end 28 Oct 2026. End dates are National Highways’ own schedule and can move.