A47 Eastbound Church Lane static lane 2 closure
1 lane17 Nov 2025 to 30 Apr 2027 · 1 lane closed, Construction work · 7 separate phases
Roadworks and lane closures
2 closures in force on the A47 right now. National Highways has 2 closures booked in the next 24 hours, the first due from 8pm, so it may already be in place.
Closure data updated 35 minutes ago
A47 Eastbound Church Lane static lane 2 closure
1 lane17 Nov 2025 to 30 Apr 2027 · 1 lane closed, Construction work · 7 separate phases
A47 eastbound Thickthorn Interchange entry slip lane 1 closure
1 lane30 Oct 2025 to 1 Apr 2027 · 1 lane of the slip road closed, Construction work
A47 eastbound Jct 19 exit slip road lane closure
Due nowA47 eastbound Jct 19 exit slip road lane closure
BookedThese are closures National Highways has scheduled, mostly overnight. Plans can change on the night, and a closure only shows above as in force once our last check has seen it set up, so one that has passed its start time may already be in place.
A47 westbound Blofield B1140 and Yarmouth road entry and exit slip road closure
scheduledA47 eastbound Thickthorn Interchange entry slip lane 1 closure
in forceA47 Eastbound Church Lane static lane 2 closure
in forceEnd dates are National Highways’ own schedule and can move. Long-running roadworks on every road.
2 closures were in force at our last check of the National Highways feed (1:38am today, UK time): A47 Eastbound Church Lane static lane 2 closure; and A47 eastbound Thickthorn Interchange entry slip lane 1 closure. This covers planned roadworks and lane closures, not accidents.
National Highways has 2 closures booked on the A47 in the next 24 hours, the first due from 8pm, so it may already be in place: A47 eastbound Jct 19 exit slip road lane closure; and A47 eastbound Jct 19 exit slip road lane closure. Plans can change on the night.
3 schemes lasting a week or more are listed. The first due to end is A47 westbound Blofield B1140 and Yarmouth road entry and exit slip road closure (31 Oct 2026); the last is A47 Eastbound Church Lane static lane 2 closure (30 Apr 2027). End dates are National Highways’ own schedule and can move.