A174/B1380 Stainton Interchange westbound entry slip road lane 2 closure with switching
1 lane6 Mar 2024 to 23 Oct 2026 · 1 lane of the slip road closed, Maintenance work · 2 separate phases
Roadworks and lane closures
1 closure in force on the A174 right now.
Closure data updated 10:02 today
A174/B1380 Stainton Interchange westbound entry slip road lane 2 closure with switching
1 lane6 Mar 2024 to 23 Oct 2026 · 1 lane of the slip road closed, Maintenance work · 2 separate phases
A174/B1380 Stainton Interchange westbound entry slip road lane 2 closure with switching
in forceEnd dates are National Highways’ own schedule and can move. Long-running roadworks on every road.
1 closure was in force at our last check of the National Highways feed (10:02am today, UK time): A174/B1380 Stainton Interchange westbound entry slip road lane 2 closure with switching. This covers planned roadworks and lane closures, not accidents.
Nothing is booked on the A174 in the next 24 hours at our last check of the National Highways feed (10:02am today, UK time). Plans can change, so check again before you travel.
One long-running scheme is listed: A174/B1380 Stainton Interchange westbound entry slip road lane 2 closure with switching, due to end 23 Oct 2026. End dates are National Highways’ own schedule and can move.